Mobile app version of desicheers.com
Login or Join
IndiaNEWS

: Flyover near JKs Banihal-Qazigund tunnel develops crack; traffic diverted #IndiaNEWS #Latest News JAMMU, Aug 23: A minor crack was spotted on the macadamized road of a flyover near the recently opened

@IndiaNEWS

Posted in: #IndiaNEWS

Flyover near JKs Banihal-Qazigund tunnel develops crack; traffic diverted #IndiaNEWS #Latest News
JAMMU, Aug 23: A minor crack was spotted on the macadamized road of a flyover near the recently opened Banihal-Qazigund tunnel along the 270-km-long Jammu-Srinagar national highway on Monday, prompting diversion of traffic for repairs, officials said.
Traffic movement on the double-tube four-lane tunnel was, however, going on smoothly, they said.
The officials said workers noticed the crack on the stretch between the toll plaza in Banihal and the tunnel early Monday, following which traffic coming from Kashmir towards Jammu was immediately diverted.
A small patch of the flyover has developed a minor crack which is being taken care of to ensure early restoration of traffic movement, an official of the Navyug construction company said.
He said it is a minor issue as all the pillars of the flyover are safe.
The 8.5-km-long Banihal-Qazigund tunnel, built at a cost of Rs 2,100 crore, was opened for traffic early this month.
Work on the tunnel, which is part of an ongoing four-lane highway project, was started in June 2011 by the Navyug engineering company, and its operationalisation reduced travel time between Jammu and Srinagar by about 1.5 hours. (Agencies)
The post Flyover near JKs Banihal-Qazigund tunnel develops crack; traffic diverted appeared first on Jammu Kashmir Latest News | Tourism | Breaking News J&K.


Intraday stocks under 50 NSE India Twitter of India

10% popularity Vote Up Vote Down


Login to follow story

More posts by @IndiaNEWS

0 Comments

Sorted by latest first Latest Oldest Best

Back to top | Use Dark Theme