Mobile app version of desicheers.com
Login or Join
IndiaNEWS

: Height of bridges on Brahmani to go up #IndiaNEWS #State Dhenkanal: Height of all the bridges on Brahmani river would be increased to facilitate implementation of National Waterway project on the

@IndiaNEWS

Posted in: #IndiaNEWS #State

Height of bridges on Brahmani to go up #IndiaNEWS #State
Dhenkanal: Height of all the bridges on Brahmani river would be increased to facilitate implementation of National Waterway project on the second largest river of Odisha, sources said.
The implementation of National Waterway project will help cargo ships sail smoothly on the river. In the first phase, work on the waterway project will commence from Samal barrage in Angul district and Dhamara in Bhadrak district via Dhenkanal and Paradip.
Implementation of the project will help in hassle-free transport of coal, fertilizers and other products from industrialised districts like Angul, Dhenkanal and Jajpur. The waterway project is also expected to help in development of agriculture, tourism and industries, and in arresting environmental degradation.
 

Implementation of the project will help in hassle-free transport of coal, fertilizers and other products from industrialised districts like Angul, Dhenkanal and Jajpur
As per the new norms of Rashtriya Jalmarg department, the height of Joranda- Kaluria- Goradia bridge is being increased to nine metres and its width to 62. 07 metres
Another bridge will be constructed on the river in between Badkamar of Parjang block and Khadgaprasad of Odapada block

Meanwhile, efforts have begun to remove the obstacles as per guidelines issued by the Rashtriya Jalmarg department of the Union government.
The authorities have taken measures to create necessary infrastructure for the National Waterway project on the river. Efforts are on to increase the height of all proposed, under construction and old bridges on the river.
As per the new norms of Rashtriya Jalmarg department, the height of Joranda- Kaluria- Goradia bridge is being increased to nine metres and its width to 62. 07 metres. The bridge will also have two approach roads of 185 metres each on both sides. A plan outlay of Rs 205 crore has been earmarked for this project. The construction work of the bridge of 1,862. 10 metre length had started March 6, 2019.
The bridge was scheduled to be completed by September 5, 2021 but the work was affected due to Covid-19 restrictions. The bridge, when completed, will connect Dhenkanal with Mathkargola under Kamakhyanagar subdivision via Joranda, Kaluria, Bhuban, Goradia and Dighi.
Moreover, another bridge will be constructed on the river in between Badkamar of Parjang block and Khadgaprasad of Odapada block. The foundation stone for this involving an outlay of Rs 114. 92 crore was laid December 25, 2021. The 1,179-metre long bridge is scheduled to be completed within two and half years.
The National Highway Authority of India (NHAI) will build another bridge on Brahmani in between Saranga under Parjang block and Ballhar of Talcher block.


Intraday stocks under 50 NSE India Twitter of India

10% popularity Vote Up Vote Down


Login to follow story

More posts by @IndiaNEWS

0 Comments

Sorted by latest first Latest Oldest Best

Back to top | Use Dark Theme